Results of electrical tests for each tape are stored in our local DB and can be accessed by clicking on the tape number in the lists of tapes below. The data are also stored in the SCT data-base under TESTs (only raw data).
Production
FORWARD:
Production of Cu tapes NEW!
Yield calculation:
Tapes produced: 190, Electrically tested: 178 (93%), Electrically OK: 172 (91%), Alignment OK: 164 (86%), Visually OK: 161 (85%)
2. 480 tapes sent to Taiwan on 11th of July 2005 List of tapes, QA plots.
Yield calculation:
Tapes produced: 600, Optical Inspection OK: 518 (86%), Electrically OK: 505 (84%), Visually OK: 480 (80%)
3. 384 tapes sent to Taiwan on 1st of August 2005 List of tapes, QA plots.
Yield calculation:
Tapes produced: 460, Optical Inspection OK and Viusal OK: 385 (84%), Electrically OK: 384 (83%).
4. 405 tapes sent to Taiwan on 22nd of August 2005 List of tapes, QA plots.
Yield calculation:
Tapes produced: 440, Optical Inspection OK and Viusal OK: 411 (93%), Electrically OK: 405 (92%).
5. 400 tapes sent to Taiwan on 5th of September 2005 List of tapes, QA plots.
Yield calculation:
Tapes produced: 440, Optical Inspection OK: 403 (92%) , Viusal OK: 402 (91%), Electrically OK: 400 (91%).
6. 399 tapes sent to Taiwan on 19th of September 2005 List of tapes, QA plots.
Yield calculation:
Tapes produced: 440, Optical Inspection OK, Viusal OK and Electrically OK: 399 (91%).
7. 683 tapes sent to Taiwan on 3rd of October 2005 List of tapes, QA plots.
Yield calculation:
Tapes produced: 740, Optical Inspection OK, Viusal OK and Electrically OK: 683 (92%).
Aluminium Tapes
Please note that forward tapes: a) have 8 traces on both layers, b) HV line is wider (0.75 mm) than other thin lines (0.5 mm)
Shipments:
-----------------------------------------------------------------------------------------------------------------------------
BARREL:
Shipments:
______________________________________________________________________________
Preseries
60 tapes sent to Taiwan in April 2002. List of tapes. QA plots